|
9 Servers Green Cloud Computing Virtualization Reduce Data Center Costs
OS-easy Vserver support to Improve server hardware utilization
OS-easy Vserver Reduce data center costs
OS-easy Vserver Ensure business continuity
OS-easy Vserver adapts to business changing and growing
OS-easy Vserver used for Rapid deployment of applications
OS-easy Vserver builds experimental environment
OS-easy Vserver Function List :
Compare Item | Before Virtualization | After virtualization |
Server amount | 9 servers | Newly purchased 3 physical servers, virtualized to 30 virtual servers according to the ratio of 1:10. |
hardware utilization | Different server utilization is uneven, average 35% | resources Integration, on demand positioning, server resource utilization increased to 80% |
Application deployment speed | When a new application needs to install, you need to purchase a new server, install operating system, patches, install applications, configure services, security settings, deploy cycle in 3-5 days. | Pre-established variety of operating systems, application templates, and deploy wizard or copy from a virtual machine, half an hour to complete a new application |
Business Continuity | Server hardware failure, data loss, downtime, business interrupted | Online migration of virtual machines to different physical servers, no need to interrupt business |
Maintenance | Application deployment, build environment, network configuration, huge workload, need on-site maintenance, 10 servers/1 administrator. | Remote data center management, no need on-site maintenance, 100 server/ 1 administrator |
power consumption | General server (4 CPU) 650 watts * 24 * 30 = 468 kWh/month of about 250usd electricity fee 10 = 2500usd / year | Green energy, save floor space, reduce cabinet amount 3 sets = 750usd / year |
Description:
Business challenge:
With the development of information technology, upgrading applications, growing and centralized business requirements, there has increasingly demanding for IT infrastructure. Data center needs to provide the required capacity more quickly. However, if purchase of new servers and other equipment, will not only increase the purchase and operating costs, but also bring more power and cooling expenses, and server resources has not been fully utilized. Intermediate Court faced the following challenges:
1. How to quickly deploy information applications and service platforms on the existing infrastructure
2. The existing IT infrastructure is sufficient to support the future expansion and change?
3. How to find and solve normal applications access, ensuring high availability and continuity
4. The current management mode (staff amount, technology, service efficiency) can support or not.
5. Information construction cost can see the return on investment or not.
Solution:
use server clusters and OE-VServer virtualization software, configure an efficient shared storage, integrated Trials ISIS, case inquiry system, digital CRIC system, Technology Court, document shielding system, document calibration system, HR management system into virtualized machines. Configure virtual cluster advanced feature to achieve clustered computing, unified storage, unified backup, centralized management, resource elastic expansion, easy maintenance and upgrades, which achieves Municipal Court having efficiency, and cost-effective data center, it will provide a scalable hardware platform to support the information technology development for the Municipal Court for 10 years.
OS-Easy server virtualization platform (refer to : OS-Easy VServer) is a complete server virtualization and management software that contains all the important elements of virtualization, adopt virtualization to make all servers as one and can be virtualized to run multiple server operating systems, which achieves the virtualization of computing resources, storage resources and network resources to save hardware investment and management. through a unified WEB based interface to manage and dispatch these virtual machines, thus to improve hardware utilization , reduce business operating costs to ensure system security and reliability, and assist IT organizations to build efficient, safe and stable cloud data center.
Benefit:
1. Improve server hardware utilization: Dynamically divided multi-server cpu, ram, hard disk hardware resource, rational use, on-demand provisioning to different applications, which can increase single physical server utilization from 15% -35% to 65% -90% in average.
2. Reduce data center costs: From the server hardware, aspects of data center space costs, electricity costs, management costs, integration services to reduce overall operational costs of the data center, the more servers and business applications running longer time in data center, the more cost will be saved. Cost comparison analysis as reference in the following:
3. Ensure business continuity: Dynamic migration, high availability, load balancing and other automated services, effectively guarantee the stability and continuity of service access and platform operation.
4. Flexible and scalable IT infrastructure adapts to business changing and growing: Achieve unlimited hardware expansion in data center, upgrading does not affect the running application, which adapts the changing and growing IT architecture. Virtual machines isolated from each other so that the old and new business applications compatible, eliminating the "one server one application" model history.
5. Rapid deployment of applications: to accelerate the deployment of new servers and applications, greatly reducing server reconstruction and application loading times. Be initiative to increase resource planning ahead so that customer demands can be rapidly responded.
6. Reduce maintenance time: change hardware management from a few days/weeks to 1--3 hour maintenance, you can do hardware maintenance and upgrades faster now.
7. Easily build experimental environment: enterprises build production application environment, the resources required to assess before the establishment of the environment, which can be carried out in a virtual machine environment test, then formally extended to the real production environment, minimizing the IT risk.
8. Graphical Web interface: web based interface for configuration and management, provides a wealth of remote management and control interface to achieve the management at home, greatly simplifying the operation and maintenance of large numbers of servers.
Applications:
Education | University data center, College data center, Computer Department |
Police | Ministry of Public Security, Provincial Public Security Bureau, City Public Security Bureau |
Court | Higher court, grass-root court, local court, intermediate court |
Social Insurance | Ministry of Social Insurance, Provincial Social Insurance Bureau, City Social Insurance Bureau |
Healthcare | National Health and Family Planning Commission; Ministry of health department; Health Bureau; Hospital, Community Health Station |
Competitive Advantage:
1. The primary advantage: after five years of market-proven, at
least 26,280 hours of trouble free operation
2. Simple deployment: five steps to complete the installation with
graphical interface;
3. Simple upgrade and extension: non-stop business operations to
upgrade.
![]() |
9 Servers Green Cloud Computing Virtualization Reduce Data Center Costs Images |